CETA is part of the Group CETA is part of the Group COGEFIN
  • English

References

Footbridge – Casnigo–Vertova Connection

Metal carpentry structures

Comunità Montana Valle Seriana: CETA solution with steel pedestrian and cycle bridge

At the Comunità Montana Valle Seriana, a CETA pedestrian and cycle bridge made of metal carpentry was built.

 

  • Type: Pedestrian and cycle bridge
  • Length: 50 m
  • Width: 2.40 m
  • Total weight: 29 tons
  • Finish: SISTEMA TRIPLEX® by NORD ZINC SRL, a corrosion protection and aesthetic finishing system using hot-dip galvanizing and powder coating

 

The solution ensured strength, durability, and landscape integration, meeting the sustainable mobility needs of the area.

🎥 Watch the timelapse of the Casnigo–Vertova Footbridge installation phases: youtube

Discover the available CETA solutions: CETA Metal Structure
Footbridge – Casnigo–Vertova Connection