news


Benin: The Trip Begins From Djougou

Benin: The Trip Begins From Djougou

Publication date: 21-12-2020
Overcoming all the obstacles of the local reality, CETA concludes the construction of the first of 7 metal carpentry roofs.
The grandstand of the new stadium of Djougou was thus completed by the roofs with a overhang of about 17 meters and a length of about 43 meters covering almost 800 square meters of surface.
This website or its third-party tools use cookies, which are necessary to its functioning and required to achieve the purposes illustrated in the  Cookie Policy. If you want to know more or withdraw your consent to all or some of the cookies, please refer to the cookie policy. By closing this banner, scrolling this page, clicking a link or continuing to browse otherwise, you agree to the use of cookies.
Ok