news


Benin: CETA Reconfirms its Project Capacity

Benin: CETA Reconfirms its Project Capacity

Publication date: 09-12-2020
Through the re-engineering of the initial project, CETA's technical staff designed a static structural model of the 7 roofs in metal carpentry with better reach and even with less weight.
Once the structural model has been confirmed, CETA proceeds with the elaboration of the constructive drawings followed by the manufacture. [Keep it going]